PALI PTP D.C

Client: Pan Asia Logistics Investment, PALI PTP Sdn Bhd

Intended use of floor: Random Traffic Distribution Centre

Project specification: F-Number System - FF39 FL32

Slab design: Hollow core slab - Concrete Topping System with single layer of reinforced mesh 

Total gross area: 47,490m2

Project Location: Mukim Banar Serendah, Daerah Hulu Selangor

Floor System: Zackea

[INTERNATIONAL BRAND CAR SPARE PART LOGISTIC HUB]